Project Development & Environment (PD&E) Study:

SR 429 Capacity Improvements from Tilden Road to Seidel Road

SR 429 Capacity Improvements from Tilden Road to Seidel Road

The Central Florida Expressway Authority (CFX) is performing a Project Development and Environment (PD&E) Study for the State Road (SR) 429 (Daniel Webster Western Beltway) Capacity Improvements. The study corridor extends along SR 429 from Tilden Road to Seidel Road in Orange County.

The PD&E Study will analyze and evaluate the proposed widening of SR 429 from Tilden Road to Seidel Road. Proposed improvements include the inside widening of SR 429 from four lanes to six lanes and the addition of wider median shoulders, known as Flex Lanes, that can temporarily accommodate additional traffic during emergency response events. A preliminary noise study will also be conducted as part of this PD&E Study. These improvements are like the ongoing capacity improvements on SR 429 from Tilden Road to SR 414 (Apopka Expressway).

Study goals include the following:

  • Enhancing mobility for the region’s growing population and economy by providing additional transportation infrastructure.
  • Providing consistency with local plans and policies.
  • Promoting regional connectivity.
  • Enhancing evacuation and emergency services response.
  • Adding future capacity by incorporating Flex Lanes.

Study Participation

We value your input. Public involvement and interagency coordination are integral to the PD&E Study process, and opportunities for public participation will be provided. CFX anticipates holding an Alternatives Public Workshop in February 2025 as part of this study.

Para más información en español comuníquese con Maria Parada al 407.487.2474 o por correo electrónico a Maria.Parada@CFXway.com.

Additional Information

This is a Project Development and Environment (PD&E) study which is an initial phase of determining right-of-way acquisition. Property owners near a proposed transportation project often want to know an agency’s process for buying needed private property. Click here for the Central Florida Expressway Authority’s policy on right-of-way acquisition.

Additional SR 429 Capacity Improvements from Tilden Road to Seidel Road PD&E Study Information

Email: ProjectStudies@CFXway.com
Phone: 407-487-2474


Central Florida Expressway Authority

4974 ORL Tower Road
Orlando, FL 32807

Phone: (407) 690-5000
Fax: (407) 690-5011
Email: info@CFXway.com

Comment Form

To submit a question or comment, please complete and submit the form below.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Back to Top