Sunday | Monday | Tuesday | Wednesday | Thursday | Friday | Saturday |
1 | ||||||
2 | 3 | 4 | 5 | 6 March Environmental Stewardship Committee Meeting (rescheduled from 2/27) 10:00 a.m. March Environmental Stewardship Committee Meeting (rescheduled from 2/27) Bid Opening: SYSTEMWIDE AET MAINLINE SIGNING 1:30 p.m. Bid Opening: SYSTEMWIDE AET MAINLINE SIGNING | 7 | 8 |
9 | 10 | 11 Bid Opening: SYSTEMWIDE FY 23 COATINGS OF RAMP PLAZA BUTTERFLY STRUCTURES 1:30 p.m. Bid Opening: SYSTEMWIDE FY 23 COATINGS OF RAMP PLAZA BUTTERFLY STRUCTURES Bid Opening: SR 528 WIDENING FROM GOLDENROD ROAD TO NARCOOSSEE ROAD 1:30 p.m. Bid Opening: SR 528 WIDENING FROM GOLDENROD ROAD TO NARCOOSSEE ROAD | 12 | 13 Southport Connector PD&E Study Alternatives Public Workshop 5:30 p.m. Southport Connector PD&E Study Alternatives Public Workshop | 14 | 15 |
16 | 17 | 18 Technical Review Committee Meeting – Project Scope: CONSULTANT SERVICES FOR SYSTEMWIDE OVERHEAD SIGN AND TRAFFIC SIGNAL MAST ARMS (TSMA) INSPECTIONS 10:00 a.m. Technical Review Committee Meeting – Project Scope: CONSULTANT SERVICES FOR SYSTEMWIDE OVERHEAD SIGN AND TRAFFIC SIGNAL MAST ARMS (TSMA) INSPECTIONS | 19 | 20 Bid Opening: PRESSURE WASHING SERVICES SR 429, SR 414, SR 451, AND SR 453 1:30 p.m. Bid Opening: PRESSURE WASHING SERVICES SR 429, SR 414, SR 451, AND SR 453 | 21 | 22 |
23 | 24 | 25 | 26 March Right of Way Committee Meeting - CANCELED 2:00 p.m. March Right of Way Committee Meeting - CANCELED | 27 Prebid Meeting: SYSTEMWIDE GUARDRAIL PROTECTION IMPROVEMENTS 10:00 a.m. Prebid Meeting: SYSTEMWIDE GUARDRAIL PROTECTION IMPROVEMENTS | 28 | 29 |
30 | 31 |