State Road 452 Seminole Connector

Project Overview

The Central Florida Expressway Authority (CFX) is currently designing a connection from State Road 417 (Seminole Expressway) to Lake Mary Boulevard near Red Cleveland Boulevard and the Orlando Sanford International Airport. This new roadway, designated as State Road 452/Seminole Connector, is expected to improve traffic flow and operations in the area.

The 1.6-mile project provides direct access from SR 417 to the Orlando Sanford International Airport area. Design also includes an interchange at Lake Mary Boulevard and a partial interchange at SR 417 (with access to and from the south), near the Lake Jesup Toll Plaza. Drivers would be able to enter the Connector from all directions at Lake Mary Boulevard.

Construction is scheduled to begin in 2031.

Preferred Alignment 2A connecting SR 417 to Red Cleveland Boulevard

Contact Information

Nick Lulli and Tina Thomas
Public Information Officers

Phone: 407-505-5594
Email: Design@CFXway.com

Expressway Project Alerts

Currently, there are no alerts.

View All Alerts on Map

Construction Timeline

Design Start
Mid 2026

Construction Start
2031

Completion
TBD


Project Benefits

Enhances mobility for the area’s growing population and economy by providing additional transportation infrastructure.

Promotes regional connectivity.

Provides consistency with local plans and policies.

Provides direct access to the Orlando Sanford International Airport.

Project Documents

View and download the project materials below. Select a document link to open the PDF in a new tab.

Questions? Contact Us

For questions about the project or to request a project presentation, use the contact information below.

Tina Thomas & Nick Lulli
Public Information Officers

Phone: 407-505-5594

Email: Design@CFXWay.com

Back to Top