About the SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study
In September 2022, CFX began conducting a Project Development and Environment (PD&E) Study for capacity improvements to SR 408 between Kirkman Road and Church Street.
More than 164,000 vehicles per day travel on SR 408 near downtown Orlando. This study will evaluate alternatives for improving traffic flow by adding an eastbound lane from Kirkman Road to Church Street and a westbound lane from John Young Parkway to Kirkman Road. Most of the work would occur within SR 408’s existing right of way.
CFX is developing and evaluating alternatives to determine a preferred alternative. All factors related to the design and location of the project are being considered including transportation needs, financial feasibility, social impacts, economic factors, environmental impacts, engineering analysis and right-of-way requirements.
Public Input
Public involvement and interagency coordination are integral to the study. CFX anticipates holding one public meeting during this six-month study. Details on the date and location of the public meeting will be posted once confirmed.
Additional SR 408 Capacity Improvements I-4 to Goldenrod Road PD&E Information
Email: ProjectStudies@CFXway.com
Phone: 407-802-3210
Central Florida Expressway Authority
4974 ORL Tower Road
Orlando, FL 32807
Phone: (407) 690-5000
Fax: (407) 690-5011
Email: info@CFXway.com
Comment Form
To submit a question or comment, please complete and submit the form below.
"*" indicates required fields
- SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study Project Map
- SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study Schedule
- SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study Fact Sheet
- SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study Public Meeting Video
- SR 408 Capacity Improvements Kirkman Road to Church Street PD&E Study Public Meeting Summary
- SR 408 Air Quality Tech Memo-FINAL
- SR 408 Comments & Coordination-FINAL
- SR 408 Contamination Screening Tech Memo-FINAL
- SR 408 Cultural Resources Desktop Analysis-FINAL
- SR 408 Environmental Assessment Technical Memorandum-FINAL
- SR 408 Existing Conditions Technical Memorandum-FINAL
- SR 408 Geotechnical Memo-FINAL
- SR 408 Pond Siting Report-FINAL
- SR 408 Preliminary Engineering Report-FINAL
- SR 408 Project Environmental Impact Report-FINAL
- SR 408 Project Traffic Analysis Memo-FINAL
- SR 408 Traffic Noise Study Report-FINAL
- SR 408 Typical Section Package-FINAL
- SR 408 Utility Assessment Technical Memorandum-FINAL
- SR 408 Water Quality Impact Evaluation Checklist-FINAL