State Road 429 Widening from Tilden Road to State Road 414

CFX will widen SR 429 to six lanes (three lanes in each direction) between Tilden Road and SR 414 to improve traffic flow and relieve congestion. Construction is expected to begin by summer 2021.

To minimize impact to motorists, the SR 429 widening project will be divided into three segments, each of which is anticipated to take approximately two years to complete:

Click here for the SR 429 Corridor Widening Fact Sheet

Draft Traffic Noise Study Report for Segment 2

Segment 1:  Tilden Road to Florida’s Turnpike
This 3.5-mile project will add a travel lane in each direction, expanding the expressway to a total of six lanes.

Segment 2: Florida’s Turnpike to West Road
This 6.1-mile project includes three proposed sound walls.
Click here for the Fact Sheet

Segment 3: West Road to SR 414
This 3.4-mile project will also add a travel lane in each direction, expanding the expressway to a total of six lanes.